| : | FRP trough Spiral | ||
| : | FRP spiral chute with a domestic advanced level of high-performance re-election of the new equipment. For sorting 0.3-0.02 mm size of the fine-grained iron, tin, tungsten, tantalum, niobium, gold, coal, monazite, rutile, zircon, as well as sufficient proportion of the poor of other metals, non-metallic minerals, By the Ministry of metallurgical research organization, design, colleges and universities and factories and mines and other units through the identification, that the device performance, advanced sorting indicators to determine to promote the use of mass production. This equipment is now in color, black metal mining a large number of applications, and Metallurgy Research Department of Science and Technology Achievement Award. The Company is designed to the latest drawings and complete sets of production technology and strict quality inspection to ensure that the technical requirements of the product. Serialization of a variety of manufacturing specifications for glass fiber reinforced plastic spiral chute for non-ferrous metals, ferrous metal mines, coal and coal chemical industry, as well as the election of sulfur plant research, design, selection of laboratory institutions. | ||
First, the structure of glass fiber reinforced plastic spiral chute to the 1, even at the mine, 2, a cross or tripod, 3, to the mine shafts, 4, spiral groove, 5, the interception of the product trough, 6, gather product bucket, 7, trough support Seven parts. Spiral into a film by the connection of the spiral groove is a major component. Spiral film by the GRP (glass fiber reinforced plastic) made by then bolt together trough Spiral of the sorting area there is a pre-wear layer. It has a light, strong, durable consumer goods advantages. Spiral groove at the top of the pipe to set up a number of mine even sub-sub-mining uniform, easy to control. Sub-ore-bearing placed on the freedom of the Cross (or tripod). Be divided equally between the pulp through the trough Spiral mounted on the end of the first to the trough slowly to the mine to the spiral groove on the surface, for sorting. Trough Spiral of the end of the block valves are installed in new-product interception slot will be selected along the Radial according to the new products are divided into three grades (or four) of new products. The block valve used to change the location of the new products, the width of the interception. New fighting was concentrated concentric ring of a tube, has been intercepted stream mineral long were derived together. Trough Spiral of the cross-section, in particular changes in the slope of the curve for fine particulate material sorting. Spiral chute with a simple structure, no moving parts, light and noise-free, easy to configure the installation and maintenance advantages. Second, the installation of spiral chute installation procedures
and requirements are as follows: | |||
See more products from this supplier.
Do you want to show products of your own company? Join FREE now!